Tuesday, 31 March 2015
Sunday, 29 March 2015
Progress on 3D Models
Steel beams/rods supporting the workshop above ground
Workshop above ground
Saturday, 28 March 2015
Stairs sketches and Floor plans
First rough sketches
2nd sketches after thinking of where and how the stairs would connect to the levels
Sections of stairs, first page is above ground and the second page is below ground
above ground
Below ground
Below ground
Above ground
Developed stairs
Floor Plans
Above ground (Rolex workshop)
Gallery/Showroom (In between/Ground level)
Below ground (Hazan Motorworks workshop)
2nd sketches after thinking of where and how the stairs would connect to the levels
above ground
Below ground
Below ground
Above ground
Developed stairs
Floor Plans
Above ground (Rolex workshop)
Gallery/Showroom (In between/Ground level)
Below ground (Hazan Motorworks workshop)
36 Custom Textures
36 Words
Applied Textures:
Below (Hot)
Above (Indestructible)
In between (Electric)
TEXTURE APPLIED TO BUILDING SURFACES
Applied Textures:
Below (Hot)
Above (Indestructible)
In between (Electric)
TEXTURE APPLIED TO BUILDING SURFACES
Wednesday, 25 March 2015
Work in progress. Models.
I decided to develop this section into a 3d model
Progress on development (sketching)
Staircase leading from upper workshop to gallery
Top level, Rolex workshop
2nd view of Staircase
2nd view of ground workshop
Subscribe to:
Posts (Atom)